For residential properties in Abu Dhabi, the Department of Municipalities and Transport introduced a simplified permit procedure in August 2025 for specified minor works. DMT expressly includes non-structural interior or exterior modifications, general maintenance and interior finishes among the types of minor work covered by that initiative. That does not mean every interior project is permit-free; the required route still depends on what is being changed and the specific property.
Building management, landlord, developer or community approvals can apply separately. Structural work, significant MEP changes, wet-area relocation, commercial fit-out, fire-life-safety changes or specialist activities can require additional drawings, consultants or approvals. On an affordable project, identifying that route early is important because a seemingly small layout change can create professional fees and construction work that are disproportionate to its design benefit.
- Confirm landlord / building / community rules before demolition
- Keep kitchens and bathrooms in existing service zones where practical
- Avoid structural modifications unless they solve a major functional problem
- Check MEP implications before approving new partitions or ceilings
- Price approval / consultant costs separately from decorative work
- Do not order fixed joinery against an unapproved layout
Read the current Abu Dhabi DMT — streamlined permit process for minor works ↗