Ajman Free Zone publishes separate Minor Fit-Out and Major Fit-Out services. The current Minor Fit-Out service is for internal changes that do not affect the main structure or allocated utilities and do not require major changes to fire systems or the approved electrical load. Its published starting price is AED 6,000 with an estimated three-day delivery target once requirements are complete.
AFZ's Major Fit-Out service covers structural, fire-safety, mechanical, electrical or significant layout modifications. The current published service fee is AED 12,000 with a three-day estimated processing target. Required documents can include existing / proposed architectural layouts, electrical drawings, load schedule, mechanical drawings, AC outdoor-unit / drainage layout, Civil Defence-approved fire-safety drawings, structural information for a mezzanine where applicable, additional electricity-load approval where applicable and a signed HSE risk assessment.
For offices outside the free zone, do not assume every decorative refresh needs the same route as building alterations. Ajman Municipality & Planning Department has separate building-licensing services for additions and architectural / structural changes. Where office work goes beyond finishes into building modification, service approvals can include EtihadWE, telecommunications, Ajman Sewerage and Civil Defence depending on the property and scope.
Managed buildings can also impose owner / landlord NOCs, contractor registration, access timing, deposits, protection requirements and debris rules. We therefore ask for the building or free-zone fit-out manual before finalising programme and technical assumptions.
- Confirm whether the premises are Ajman Free Zone, mainland or another managed jurisdiction
- Obtain tenancy / ownership authorisation and current fit-out rules
- Classify the work as furniture / decorative refresh, minor fit-out, major fit-out or deeper building modification
- Prepare existing + proposed layouts before demolition starts
- Confirm electrical load, HVAC and data requirements
- Identify Civil Defence / fire-system implications
- Use appropriately licensed consultants / contractors where required
- Allow permit, NOC, inspection and external-approval time in the opening programme
- Keep authority fees, deposits and third-party charges separate in the cost plan
Read the current Ajman Free Zone — Minor and Major Fit-Out service cards ↗